PART II: INSTALLATION
17
(RX92R-FGR)
Fitting the burner to the boiler
To install the burner into the boiler, proceed as follows:
1
make a hole on the closing door of the combustion chamber as described on paragraph “Overall dimensions”)
2
place the burner to the boiler: lift it up and handle it according to the procedure described on paragraph “Handling the burner”;
3
place the 4 stud bolts (5) on boiler’s door, according to the burner drilling template described on paragraph “Overall dimensions”;
4
fasten the 4 stud bolts;
5
place the gasket on the burner flange;
6
install the burner into the boiler;
7
fix the burner to the stud bolts, by means of the fixing nuts, according to the next picture.
8
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate
insulating material (ceramic fibre cord or refractory cement).
(RX512R-FGR, RX515-FGR)
Fitting the burner to the boiler
To perform the installation, proceed as follows:
1
drill the furnace plateas decribed in paragraph (“Overall dimensions”);
2
place the burner towards the furnace plate: lift and move the burner by means of its eyebolts placed on the top side (see”Lifting and
moving the burner”);
3
screw the stud bolts (5) in the plate holes, according to the burner’s drilling plate described on paragraph “Overall dimensions”;
4
place the ceramic fibre rope on the burner flange (if necessary, use a spray adhesive on the flange).
5
install the burner into the boiler;
6
fix the burner to the stud bolts, by means of the fixing nuts, according to the picture below.
7
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate
insulating material (ceramic fibre cord or refractory cement).
;
Keys
1
Burner
2
Fixing nut
3
Washer
4
Sealing gasket
5
Stud bolt
7
Blast tube
Keys
1
Burner
2
Fixing nut
3
Washer
4
Ceramic fibre plait
5
Stud bolt
7
Blast tube
4
Summary of Contents for LAMTEC BT3 Series
Page 46: ...PART IV MAINTENANCE 46...
Page 47: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 114: ......
Page 123: ......
Page 124: ......
Page 125: ...WB1 QF A QF B...
Page 126: ......
Page 127: ......
Page 129: ......
Page 130: ......
Page 131: ...INTERFACE...
Page 132: ...R1 R2 POT...
Page 135: ......
Page 136: ......
Page 137: ......