Instructions for the installer
3.9 - FLUE OUTLET INSTALLATION
The flue system must be installed in accordance with the local
and national Standards (refer to Standard UNI-CIG 7129, point
4 and UNI-CIG point 5)
We recommend using only original UNICAL
flue outlet systems.
Damages caused by installation errors and for
non-observance of the instructions given by
the same manufacturer will invalidate all the
supplier’s contractual or extra contractual re-
sponsibilities.
If the boiler has to be replaced ALWAYS replace the flue
outlet system.
The boiler has been approved for the following flue configura-
tions:
Type C13
Boiler designed for connection to horizontal inlet and outlet
terminals, which admit fresh air to the burner and discharge
the products of combustion to the outside through concentric
or twin ducts.
The minimum distance between the inlet air duct and the flue
outlet duct must be of 250 mm and both terminals must be
positioned within a 500 mm square section.
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
aa
Type C33
Boiler designed for connection to vertical inlet and outlet ter-
minals, which admit fresh air to the burner and discharge the
products of combustion to the outside through concentric or
twin ducts.
The minimum distance between the air inlet duct and the flue
gas outlet duct must be of 250 mm and moreover both termi-
nals must be positioned within a 500 mm square area.
Type C43
Boiler designed for connection to collective flue systems inclu-
ding two ducts, one for the air inlet and the other for the di-
scharge of products of combustion through concentric or twin
ducts.
Type C53
Boiler with separate air inlet and products outlet. These ducts
can discharge into areas with different pressure.
The two terminals must not be fitted on to two opposite
walls.
Type C83
Boiler designed for connection to a terminal for the intake of
combustion air and to an individual or collective chimney for
the discharge of the products of combustion.
The chimney must comply to the current regulations.
Type B23
Boiler designed to be connected to an open flue which will
terminate vertically through the roof. The combustion air is
withdrawn directly from the room where the boiler is installed.
WARNING: for this type of connection the room must comply
with the same installation regulations valid for open chimney
boilers.
The chimney must comply to the current regulations.
Type C63
Boiler designed for connection to a combustion air inlet and
flue products discharge system approved and sold separately.