14
Instructions for the installer
3.4 - BOILER LOCATION
When selecting the position for the installation of the boiler
please comply to the following safety requirements:
- Fit the appliance in rooms protected from frost
- In rooms where aggressive vapours or dust are present, the
appliance must be able to operate independently from the
air of the location room
- Do not use or leave explosive or easily inflammable material
(as for example: petrol, paint, paper) in the room where the
appliance has been installed
- The appliance must be installed exclusively on a vertical
and solid wall, capable of adequately supporting the weight
of the boiler
- Leave a clearance of at least 100 mm on each side of the
boiler to facilitate subsequent servicing
VIEW ON WALL
C
Hot water outlet ½”
F
Cold water inlet ½”
G
Gas supply ¾”
M1
System flow ¾” – zone 1 (MIXED)
M2
System flow ¾” – zone 2 (DIRECT)
M3
System flow ¾” –zone 3 (MIXED) (optional)
R1
System return ¾” zone 1 (MIXED)
R2
System return ¾” – zone 2 (DIRECT)
R3
System return ¾” zone 3 (MIXED) (optional)
Ri
DHW recycle ½”
VSS DHW safety valve
VSR CH safety valve
S
Condensate drain outlet
S
R3
R2
G
R1
M3
M2
M1
C
VSS
Ri
F
VSR
Summary of Contents for Alkon Cargo 35
Page 1: ...ALKON CARGO 35 INSTALLATION AND SERVICING MANUAL 00332603 2nd edition 04 2008 ...
Page 46: ...NOTE ...
Page 47: ...NOTE ...