Get ready to start a measuring campaign
27/92
4. Reattach the tube and draw
the syringe up again until the
spacers snap in. The water now
is being degassed.
We recommend controlling the
quality of the vacuum by
observing the refilling window in
tensioVIEW.
Fig. 24
Leave the assembly for at least 2 hours (the longer the better).