RF POWER SUPPLY and MATCHINGBOX
3. Setup
20
3-2. RF generator installation
Install the RF generator according to the following procedure.
Caution
The RFS-1330N, RFS-1350N, and MBX-1350N are heavy objects. When moving
them, always hold the handles and use two or more workers to lift them up and move
them. There is a risk of damage if mishandled.
Caution
The system cannot accommodate lightning surges, spike voltage, or momentary power
failures. If a lightning surge, spike voltage, or momentary power failure is input from the
power receiving facilities, the system may be damaged or malfunction. Use the system in
an environment without lightning surges, spike voltage, and momentary power failures.
Danger
In order to work safely, inform all related parties of the details of the work, confirm
the hazardous work (working in high locations, high voltage work) before starting the
work, and implement all measures to prevent danger. In order to reliably shutoff
hazardous energy, please use LOTO (lockout-tagout).