5.6.7 Operation
When the preparations for operation are completed, make a test run.
Supply cooling water and put the pump into operation. The oil in the viewing window will bubble
immediately after the start of pump operation, but the bubbles will soon disappear.
During operation, check the following.
(1)
Recheck the rotational direction of the pump.
(2)
Make sure that the cooling water is flowing.
(3)
Make sure that the oil level is between the two level lines.
Follow the procedure in the “4.1”, “4.2” Operation”.
5.6.8 Pumping start operation
Refer to the “Fig. 12”.
(1)
Close the main valve above the inlet side of the mechanical booster pump and start the
pump for separate evacuation to evacuate the lubricating chamber of the mechanical
booster pump.
Then start the backing pump to evacuate the mechanical booster pump and piping.
(2)
Open the main valve above the inlet side of the mechanical booster pump to evacuate the
vacuum chamber.
(3)
When the vacuum chamber is evacuated to a pressure lower than the maximum intake
pressure (Refer to the “Table. 2”) , start the mechanical booster pump.
Follow the procedure in the “4.1”, “4.2” Operation”.
5.6.9 Shutdown operation
Refer to the “Fig. 12”.
(1)
Close the main valve between the vacuum chamber and the inlet side of the mechanical
booster pump.
(2)
Stop the mechanical booster pump.
(3)
Stop the backing pump.
(4)
Stop the pump for separate evacuation.
(5)
Open the leak valve 1 to vent the mechanical booster pump and the backing pump to the
atmospheric pressure.
(6)
Open the leak valve 2 to vent the lubricating chamber to the atmospheric pressure.
(7)
Stop the cooling water supply.
Follow the procedure in the “4.1”, “4.2” Operation”.
Summary of Contents for PMB100D
Page 2: ......
Page 3: ...Declaration of Conformity...
Page 39: ...YK11 0016 DI 002 08 12 2 4 Dimensional drawing Fig 11 Dimensional drawing PMB100D...
Page 40: ...YK11 0016 DI 002 08 13 Fig 12 Dimensional drawing PMB300D...
Page 41: ...YK11 0016 DI 002 08 14 Fig 13 Dimensional drawing PMB600D...
Page 42: ...YK11 0016 DI 002 08 15 Fig 14 Dimensional drawing PMB1200D...
Page 43: ...YK11 0016 DI 002 08 16 Fig 15 Dimensional drawing PMB2400D...
Page 62: ...YK11 0016 DI 002 08 35...
Page 65: ...YK11 0016 DI 002 08 38...
Page 72: ...YK11 0016 DI 002 08 45...
Page 84: ...YK11 0016 DI 002 08 57 Fig 28 PMB300D Optional attachment figure...
Page 85: ...YK11 0016 DI 002 08 58 Fig 29 PMB600D Optional attachment figure...
Page 86: ...YK11 0016 DI 002 08 59 Fig 30 PMB1200D Optional attachment figure...
Page 89: ...YK11 0016 DI 002 08 62 Fig 33 Dimensional drawing PMB2400D Horizontal exhaust model...
Page 99: ...YK11 0016 DI 002 08 72...
Page 105: ...YK11 0016 DI 002 08 78...
Page 119: ......