4
EE THE REQUIREMENTS CONCERNING
1.14 .............................................. 32
................................................................................... 42
............................................................... 49
List of available Sterilization and Test Programs (refer to sec.8.4.2 for maximal allowed
..................................................... 51
............................................................................................. 54
PREVENTIVE AND SCHEDULED MAINTENANCE TO BE PERFORMED BY THE OPERATOR ............. 57
FULL LIST OF INFORMATIVE SCREEN DISPLAY SYMBOLS, OPERATING MESSAGES, ERROR
.......................................................................................... 65
NSTALLATION FOR THE FIRST TIME
OADING THERMAL PRINTER PAPER ROLL
......................................................................... 75
ONNECTING THE INTERFACE CABLES TO THE PRINTER
......................................................................... 77