18
Special accessory installation
1. Set of screws
for height compensation with
spacer plates, max. 45 mm,
eight DIN 933 screws
M10 x 95 8.8, galvanized,
part no. 60010-70000.
2. Spacer plate kit
(two 15 mm spacer plates)
for height compensation
max. 45 mm (3 plates) at each
side (e.g. installed behind axle)
part no. 60010-66000.
3. Low chassis kit
for height compensation for
caravan / trailer with frame height
of
less than 140 mm,
part no. 60010-64900.
In Germany,
this installa-
tion kit
must be accepted
by a vehicle expert.
4. AL-KO Vario III / AV
Installation kit
for caravans with
AL-KO Vario III / AV Chassis
(frame thickness less than 2.8 mm)
mandatory,
part no. 60010-21500.
Spacer plate set for
single-axle
caravans up to
a total weight of
1700 kg
with chassis AL-KO Vario III / AV
(2 x 4 spacer plates à 15 mm)
to compensate height differences
of up to 60 mm
part no. 60010-70500.
5. Mover mounting set
for Eriba Touring
part no. 60030-09000.
60 - 100 mm
Installation is not possible in some cases because of
attachments to the underbody. Contact your dealer if
necessary.
Detailed installation instructions are provided with the
relevant mounting set.
The Mover SE R / TE R is not approved for installa-
tion on caravans / trailers with any other chassis!
Any drilling (exception: when using low chassis kit*) or weld-
ing to the chassis is not allowed. Under no circumstances
remove any suspension components from the chassis.
* In the case of the AL-KO Vario III / AV Chassis, never drill
into the vehicle frame even if the flat frame kit is used.
Choice of location
The Mover should preferably be installed in front of the axle,
but can also be installed behind the axle under special circum-
stances (e.g. lack of space). Only the bolts that are provided
must be used to secure the Mover (or the add-on parts
provided as special accessories).
Installation of the drive units
The frame of the vehicle must be kept free of rust and heavy
soiling and without any damages to the suspension
components.
The wheels and tyres that are fitted to the caravan must be of
the same size and model and inflated as per the manufacturer’s
instructions.
Remove all components from packing and place on the floor.
In order to maintain the validity of the General Operating
Permit (ABE) the provided factory plates (f) must be at-
tached on the left and right sides of the cross strut between
the drive unit retaining plates.
f
Loosely attach the drive units to the lateral bar. The bolts
(lock nuts) must be no more than finger-tight.
Nut M8 (4 x)
M8 x 30 (4 x)
Place the mounting set (b) on the vehicle frame and secure
using the two bolts (c), tight enough so that it can just about
be moved on the frame.
c
b
M8 x 60 (4 x)
Self-locking nut M8 (4 x)
Washer 8
(8 x)