T3-OPX installation
Page | 30
2.
Connect the power supply cord plug to the power source outlet (grounded wall or extension
cables)
3.9
Powering on
3.9.1
Safety Check
Before powering on the TrojanThree, visibly ensure that no foreign objects are interfering with the print
engine module.
3.9.2
Power on process
Turn on the power via the power inlet switch on both T3-OPX and mail table (MT1/2)
3.10
Calibrate the table position and level unit
Calibrate the table position for the unit to determine the zero height position of the table and also ensure
the unit is aligned to the table (x/y tilt). This is handled by the process below:
1.
Open the service menu
2.
Select “Initial Full Calibration” and press run
3.
Wait for the process to finish, it will take a couple of minutes
Grounding:
Always use the supplied power supply cord connected to a grounded power outlet.
Power inlet
Summary of Contents for T3-OPX
Page 1: ...T3 OPX user guide Version 1 2...
Page 5: ...T3 OPX installation Page 4...
Page 7: ...T3 OPX installation Page 6 1 1 1 Emissions...
Page 13: ...T3 OPX installation Page 12...
Page 17: ...T3 OPX installation Page 16 2 2 Backside Height controllers 3 Inlets Ink lid Serial plate...
Page 20: ...T3 OPX installation Page 19...
Page 34: ...T3 OPX installation Page 33 i The process will use the purge height in the settings menu...