Pre-Installation
12
CVHH-SVX001A-EN
N ot e: The chiller should rem ain w ithin its protective
shrink-w rap covering during storage.
WARNING
Combustible M aterial!
Failure to follow this instruction could result in death or
serious injury or equipment damage. Shrink-w rap is a
combustible material. Avoid open flames and hot
sparks.
Type of
Re qu ir e m e n t
Tr a n e Su pplie d
Tr a n e I n st a lle d
Tr a n e Su pplie d
Fie ld I n st a lle d
Fie ld Su pplie d
Fie ld I n st a lle d
Foundat ion
•
Meet foundat ion requir em ent s
Rigging
•
Safet y chains
•
Clev is connect or s
•
Lift ing beam
Disassem bly / Reassem bly
( as r equir ed)
•
Trane w ill per for m or have
dir ect on- sit e super v ision of
t he disassem bly and
reassem bly w or k ( cont act
your local Trane office for
pr icing)
I solat ion
•
I solat ion pads or spr ing
isolat ors
•
I solat ion pads or spring isolat ors
Elect r ical
•
Cir cuit br eakers or fusible
disconnect s ( opt ional)
•
Unit m ount ed st ar t er
( opt ional)
•
PFCCs ( opt ional)
•
Jum per bar s
•
Tem perat ur e sensor
( opt ional out door air )
•
Flow sw it ches ( m ay be
field supplied)
•
Rem ot e- m ount ed st art er
( opt ional)
•
Cir cuit br eakers or fusible disconnect s ( opt ional)
•
Elect r ical connect ions t o unit m ount ed st ar t er
( opt ional)
•
Elect r ical connect ions t o r em ot e m ount ed st ar t er
( opt ional)
•
Wiring sizes per subm it t al and NEC or local codes
•
PFCCs ( r em ot e m ount ed st ar t er opt ional only )
•
Ter m inal lugs
•
Gr ound connect ion( s)
•
Jum per bar s
•
BAS w ir ing ( opt ional)
•
I PC w ir ing ( AFD and r em ot e- m ount ed st ar t er s only )
•
Cont r ol volt age w ir ing ( AFD and r em ot e- m ount ed
st ar t er s only )
•
Oil pum p int er lock w ir ing ( AFD and r em ot e m ount ed
st ar t er s only )
•
High condenser pressur e int er lock w ir ing ( AFD and
rem ot e m ount ed st ar t er s only )
•
Chilled w at er pum p cont act or and w ir ing including
int erlock
•
Condenser wat er pum p cont act or and w ir ing including
int erlock
•
Opt ion r elay s and w ir ing
Wat er piping
•
Flow sensing devices
( m ay be field supplied)
•
Taps for flow sensing dev ices
•
Taps for t her m om et er s and gauges
•
Therm om et er s
•
St rainer s ( as r equir ed)
•
Wat er flow pressur e gauges
•
I solat ion and balancing valves in wat er piping
•
Vent s and drain on wat er box valves ( one each per pass)
•
Pr essur e r elief valves ( for wat er boxes as r equired)
Relief
•
Rupt ur e disk assem bly
•
Rupt ur eGuard™ ( opt ional)
•
Vent line and flex ible connect or and vent line from
rupt ur e disk t o at m osphere
I nsulat ion
•
I nsulat ion ( opt ional)
•
I nsulat ion
•
Chiller feet insulat ion
Wat er Piping Connect ion
Com ponent s
Flanged ( opt ional)
•
Welded on flange for
2068.4 k Pag ( 300 psig)
wat er boxes
Flanged ( opt ional)
•
Vict aulic
®
t o flange
adapt er for 1034.2 k Pag
( 150 psig) wat er boxes
Vict aulic
•
Vict aulic coupling for 1034.2 k Pag ( 150 psig) and
2068.4 k Pag ( 300 psig) wat erboxes
•
Fast ener s for flanged- t y pe connect ions ( opt ional)
Ot her Mat er ials
•
Mat er ial and equipm ent t o per form leak t est ing
•
Dr y nit rogen ( 55.2 k Pag [ 8 psig] m ax im um per
m achine as needed)
Summary of Contents for CVHH
Page 110: ......