62
CLCH-SVX07C-EN
Component Installation Requirements
Seismic Isolation Requirements
Air handling equipment manufactured by Trane is capable of structurally and operationally
withstanding the seismic response criteria as required by the International Building Codes (IBC)
2000,2003, 2006, 2009. Trane has third-party certification for IBC compliance for seismic
applications for unit sizes 3-30. Certification for larger sizes is in process.
Note:
If seismic isolation has been specified, the following requirements must be adhered to for
installation. Failure to follow these instruction would void the warranty.
Anchor Requirements
Single Level Design Break
Size 3-30 - Grade to Roof Mounted (0<=Sds<=1.85) Non-Isolated
4000 psi concrete
•
3/8-inch diameter Hilti Kwik Bolt TZ carbon steel concrete anchors attached to unit base rails.
•
Quantity (2) anchors at AHU ends, (quantity (1) at each side)
•
Quantity (2) anchors at AHU unit splits, quantity (1) at each side, staggered.
•
2-inch minimum anchor embedment
•
4-3/8-inch minimum distance to the nearest edge
•
4-inch minimum concrete slab thickness
Steel dunnage/steel curb
3/8-inch diameter ASTM A325 or SAE grade 5 bolts attached to unit base located as noted above
or
1-inch long 3/16-inch welds at unit base located as noted above.
Stacked Design Break
Size 3-30 – Grade to Roof Mounted (0<=Sds<=1.85) Non-Isolated
4000 psi concrete
•
1/2-inch diameter Hilti Kwik Bolt TZ carbon steel concrete anchors attached to unit base rails.
•
Quantity (2) anchors at AHU ends (quantity (1) at each side).
•
Quantity (2) anchors at AHU unit splits, (quantity (1) at each side, staggered).
•
3 1/4-inch minimum anchor embedment
Figure 53. Isolator tie-down removal for unit sizes 66-120
Figure 54. Belt-drive plenum fan tie down
Required
clearance
Required
clearance
Summary of Contents for AM4A0A18S11SA Series
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 100: ...96 CLCH SVX07C EN Installation Electrical Figure 84 Typical VFD wiring schematic ...
Page 101: ...CLCH SVX07C EN 97 Installation Electrical Figure 85 Typical starter wiring schematic ...
Page 135: ...CLCH SVX07C EN 131 Notes ...
Page 146: ...10 1 2 STEP 8 Lift the Coil section up and away from the Blower section Set aside ...
Page 178: ......
Page 188: ...2 ...
Page 189: ...3 ...
Page 190: ...4 ...
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 250: ......
Page 251: ......