44
CLCH-SVX07C-EN
Installation - Mechanical
To assemble air handlers utilizing factory-approved and factory-provided dissimilar unit sizes for
horizontal SDU or winterizer applications, join all similar size shipping sections per “Section-to-
Section Assembly”,
Step 1
through
Step 13
,
p. 32
through
p. 39
.
Horizontal SDU/Winterizer Indoor Air Handler Assembly
To assemble dissimilar unit sizes in a horizontal SDU/winterizer configuration:
1.
Locate the mounting hardware and gasket material.
Note:
Black unit support brackets ship pre-installed on the primary (larger) unit section.
2. Apply gasket in direction of airflow between the black unit support brackets to the roof of the
primary unit. See
Figure 32
. The gasket needs to be placed such that it will be directly under the
integral base frame of the secondary (smaller) unit to be stacked on top. The secondary unit will
be centered along the width on the primary unit.
3. If there is an opening in the roof of the primary unit, apply gasket perpendicular to airflow on
the roof next to the opening (air entering side only).
Figure 32. Apply gasket in direction of airflow
Unit support
brackets
Gasket
1.0 inches T x
4.0 inches W
Airflow
Summary of Contents for AM4A0A18S11SA Series
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 100: ...96 CLCH SVX07C EN Installation Electrical Figure 84 Typical VFD wiring schematic ...
Page 101: ...CLCH SVX07C EN 97 Installation Electrical Figure 85 Typical starter wiring schematic ...
Page 135: ...CLCH SVX07C EN 131 Notes ...
Page 146: ...10 1 2 STEP 8 Lift the Coil section up and away from the Blower section Set aside ...
Page 178: ......
Page 188: ...2 ...
Page 189: ...3 ...
Page 190: ...4 ...
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 250: ......
Page 251: ......