Installation - Mechanical
•
For parallel-to-airflow channels, size channels based on a four-point load distribution (see
Figure 13
.
•
For perpendicular-to-airflow channels, size channels based on the load distribution of the
individual sections and install the channels so that both ends of every section are supported
(see
Figure 14
).
Using Integral Base Frame
If using the factory-provided integral base frame for ceiling suspension, individual sections and/
or subassemblies will have base frame shipping splits and base frame lifting lugs. When using the
base frame for ceiling suspension:
•
Suspend the unit (on both sides of the unit) at each shipping split lug as well as the four corners
of the unit (see
Figure 15
). See
Figure 7
and
Table 8 on page 27
for lug hole sizes.
•
Bolt shipping splits together.
Note:
The hanger rods must extend through the bottom of the base lug. It is the building
engineer’s responsibility to provide the appropriate hangers.
Figure 13. Typical suspension method using parallel
channels
Figure 14. Typical ceiling suspension using perpendicular
channels
Figure 15. Ceiling suspension for unit sizes 3-57
Hole diameter
is 0.625 inches
Summary of Contents for AM4A0A18S11SA Series
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 100: ...96 CLCH SVX07C EN Installation Electrical Figure 84 Typical VFD wiring schematic ...
Page 101: ...CLCH SVX07C EN 97 Installation Electrical Figure 85 Typical starter wiring schematic ...
Page 135: ...CLCH SVX07C EN 131 Notes ...
Page 146: ...10 1 2 STEP 8 Lift the Coil section up and away from the Blower section Set aside ...
Page 178: ......
Page 188: ...2 ...
Page 189: ...3 ...
Page 190: ...4 ...
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 250: ......
Page 251: ......