30
STEP 4
- Make connections per hookup diagrams.
Air Handler Hook-up Diagram
Cooling
Red
Yellow
Green
White
Blue
Yellow
Green
White
Blue
B
B - Blue
Blue
W
G
Y
Y - Yellow
Yellow
R
Red
O
Orange
Comfort Control
Air Handler
Air Conditioner
Field wiring
O **
R **
B
YI
W1
YO
G
W2
W3 *
•
* For multiple stages of electric heat, jumper W1, W2, and W3 together if comfort control has only one stage of heat.
•
** R to
O jumper must be in place as shown for cooling only, non-heat pump systems for proper operation
.
•
YI and YO connections must be made as shown for freeze protection and internally mounted condensate overflow circuits to work properly.
•
Internally mounted condensate switch is optional and must be ordered separately.
•
If 3rd party condensate overflow switches are installed, they should be wired between Y of the thermostat and YI of the EEV control.
Summary of Contents for AM4A0A18S11SA Series
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 100: ...96 CLCH SVX07C EN Installation Electrical Figure 84 Typical VFD wiring schematic ...
Page 101: ...CLCH SVX07C EN 97 Installation Electrical Figure 85 Typical starter wiring schematic ...
Page 135: ...CLCH SVX07C EN 131 Notes ...
Page 146: ...10 1 2 STEP 8 Lift the Coil section up and away from the Blower section Set aside ...
Page 178: ......
Page 188: ...2 ...
Page 189: ...3 ...
Page 190: ...4 ...
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 250: ......
Page 251: ......