Installation - Mechanical
WARNING
Heavy Objects!
Do not use cables (chains or slings) except as shown. Each of the cables (chains or slings) used
to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains
or slings) may not be of the same length. Adjust as necessary for even unit lift. Other lifting
arrangements may cause equipment or property-only damage. Failure to properly lift unit could
result in death or serious injury.
Always rig subassemblies or sections as they ship from the factory. Never bolt sections together
before rigging.
•
Make the loop of the sling parallel to the direction of airflow, if possible.
•
When hoisting the unit into position, use the proper rigging method, such as straps, slings,
spreader bars, or lifting lugs for protection and safety.
Use all lifting lugs provided.
•
For unit sizes 3 to 120 with integral base frame, use field-provided spreader bars and slings to
rig units and subassemblies as shown in
Figure 6
. The air handler is not designed to be lifted
or rigged from the top of the unit.
Figure 6.
Lifting detail for unit sizes 3 to 120
Rigging and spreader
bars furnished
by others
Summary of Contents for AM4A0A18S11SA Series
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 100: ...96 CLCH SVX07C EN Installation Electrical Figure 84 Typical VFD wiring schematic ...
Page 101: ...CLCH SVX07C EN 97 Installation Electrical Figure 85 Typical starter wiring schematic ...
Page 135: ...CLCH SVX07C EN 131 Notes ...
Page 146: ...10 1 2 STEP 8 Lift the Coil section up and away from the Blower section Set aside ...
Page 178: ......
Page 188: ...2 ...
Page 189: ...3 ...
Page 190: ...4 ...
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 250: ......
Page 251: ......