CO075--01
P14833
15
˚
15
˚
P23424
Protrusion
CO--10
--
COOLING
THERMOSTAT
INSTALLATION
1 . P L ACE THE RMO S TAT I N WATE R I NLE T HO US I NG
(a)
Install a new gasket to the thermostat.
(b)
Align the jiggle valve of the thermostat with the protrusion
of the water inlet housing, and insert the thermostat in the
water inlet housing.
HINT:
The jiggle valve may be set within 15
˚
of either side of the pre-
scribed position.
2 . CO NNE CT WATE R I NLE T WI TH LO WE R
RADI ATO R HO S E
Install the water inlet with the 2 nuts.
HINT:
Facing the top mark (protrusion) upward.
Torque:20 N
∙
m (200 kgf
∙
cm, 15 ft
∙
lbf)
3 . FI LL WI TH E NG I NE CO O LANT
4 . S TART E NG I NE AND CHE CK FO R L E AKS
CLICK HERE TO VIEW CHAPTER INDEX
Pages From Supplement
3RZ-F,3RZ-FE