P04395
SST (A)
SST (C)
Turn
P04393
SST (A)
SST (B)
Turn
A01823
Inside
S00193
Push
A01821
--
CHARGING
ALTERNATOR
CH--15
(f)
To torque the pulley nut, turn SST (A) in the direction
shown in the illustration.
Torque:110 N
∙
m (1,125 kgf
∙
cm, 81 ft
∙
lbf)
(g)
Remove the alternator from SST (C).
(h)
Turn SST (B), and remove SST (A and B).
5. 55A:, 70A:
INSTALL RECTIFIER HOLDER
(a)
55A:
Install the 4 rubber insulators on the lead wires.
NOTICE:
Be careful of the rubber insulators installation direction.
(b)
Install the rectifier holder with the 4 screws.
Torque:2.0 N
∙
m (20 kgf
∙
cm, 17.4 in.
∙
lbf)
6. 45A:
INSTALL RECTIFIER HOLDER
(a)
Install the rectifier holder.
(b)
Bend the 4 stator lead wires as shown in the illustration.
CLICK HERE TO VIEW CHAPTER INDEX
Pages From Supplement
3RZ-F,3RZ-FE