730CDT
4-45
Installing the IPS Board and RTC battery
To install the IPS board and RTC battery, follow the steps below and refer to Figures 4-40
and 4-41.
1.
Apply the
insulator
.
2.
Seat the
backup battery
, then carefully route the cable and connect it to
PJ140
.
3.
Seat the
RTC battery
and route the cable.
4.
Secure the batteries with
tape
and press the
rubber bar
in place to secure the
battery cables.
5.
Seat the
IPS board
.
6.
Connect the RTC battery cable to
PJ704
on the IPS board.
7.
Secure
one M2.5x6 screw
.
8.
Connect the
drive connector flexible cable
to
PJ700
and close the pressure
connector.
9.
Install the display assembly, jack board, modem board, speaker, LCD module, FL
Inverter board, display mask, DAA module, upper cover and keyboard, HDD,
CD-ROM drive or FDD, optional memory module, optional PC card, and battery
pack as described in Sections 4.14 back through 4.2.
Summary of Contents for Tecra 730CDT
Page 1: ...TOSHIBA 730CDT PN 730 9400 CATM 3970294 B01 ...
Page 6: ...vi 730CDT ...
Page 10: ...1 4 730CDT Figure 1 1 730CDT personal computer Figure 1 2 730CDT system unit configuration ...
Page 190: ...4 60 730CDT ...
Page 196: ...B 2 730CDT B 2 System Board Back View Figure B 2 System board layout back ...
Page 216: ...C 16 730CDT ...
Page 230: ...G 2 730CDT ...