4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
EO18-33012B
(Revision Date Apr. 24, 2008)
4.22 RFID MODULE (B-SX704-RFID-U2-EU-R)
4-139
2. Secure the Antenna Frame with the three screws removed in Step 13 of Section 4.22.3.2.
3. Connect the Antenna Cable to the Antenna Ass’y until it clicks.
Antenna Cable
Antenna Ass’y
Connector
SMW-3x6 Screw
SMW-4x8 Screw