4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
EO18-33012B
4.11 RFID MODULE (B-9704-RFID-H1-QM)
4-57
Parts Quantity Parts Quantity
Cable Clamp
1 pc.
RFID Plate
1 pc.
SMW-3x6 Double Sems Screw
7 pcs.
PT-3x6 P-TITE Screw
1 pc.
Interface Cable
1 pc.
SMW-2x10 Double Sems Screw
2 pcs.
Spacer
2 pcs.
Nylon Washer
2 pcs.
NOTE:
To install the B-9704-RFID-H1-QM in the printer, TAGSYS RFID Module MEDIO
TM
S002 and the exclusive
antenna are required separately. Before installation, solder the supplied Interface Cable to the RFID
module as shown in the picture below, and attach the RFID Module and the Antenna to the RFID Plate and
the Antenna Cover, respectively.
RFID Module
Antenna
Interface Cable