4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
EO18-33012B
4.15 RIBBON SAVING MODULE (B-9904-R2-QM-R)
4-103
NOTE: Pass the operation panel harness through the cord bush so that it is not pinched by the side panel
(L) when reassembled.
10) Fit the three locking supports into the RSV PC board.
11) Secure the RSV PC board to the printer with the locking support.
NOTE: Do not push the center of the RSV PC Board when attaching it to the printer. Doing so
may break the PC board. Hold the locking supports and push them into the holds for
securing the RSV PC Board.
Operation Panel Harness
Cord Bush
RSV PC Board
Locking Support
RSV PC Board
Holes for securing the RSV PC Board