4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
EO18-33012B
4.15 RIBBON SAVING MODULE (B-9904-R2-QM-R)
4-105
14) Connect the solenoid harness to CN1 on the RSV PC board and CN11 on the Main PC board.
Pass the solenoid harness through the cut.
15) Connect the solenoid cable to CN2 on the RSV PC board.
16) After attaching the solenoid, reassemble the operation panel ass’y and side panel (L) in the
reverse order of removal.
CN11
Main PC Board
Solenoid Harness
CN2
CN1
Solenoid Cable
RSV PC Board
Cut