Document Ref 942583-001 Rev 8
Page 2-15
Quantium 510 Installation Manual
Site Preparation
Model SVHS 3-4
Model SVHS 4-6
40
40
130
130
Prod 3
Prod 3
Prod
3
Prod
3
Prod
1
Prod
1
Prod 1
Prod 1
B side (left)
B side (left)
A side (right)
A side (right)
130
130
Prod
Prod
2
2
40
40
Prod
Prod
1
1
2 x TQP-HS and 1 x TQP-RS or 3 x submerge.
2 x TQP-HS and 1 x TQP-RS or 3 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.
Prod 1
Prod 1
Prod 2
Prod 2
40
40
130
40
130
Prod 4
Prod
2
Prod
4
Prod
1
Prod
1
Prod 1
Prod 2
Prod 1
B side (left)
B side (left)
A side (right)
A side (right)
130
40
130
Prod
Prod Prod
Prod
2
3
40
40
Prod
Prod
1
1
2 x TQP-HS and 2 x TQP-RS or 4 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.
The valve is needed for Preset or in any case of submerge.
Prod 1
Prod 2
Prod 1
Prod 3