TEST FILLING PROCEDURE
•
Do a test filling at maximum flow rate into a W&M calibrated container.
• S
top the delivery manually when the exact nominal volume of the can is displayed
on the calculator display.
•
Check the volume on the gauge on the calibrated container.
•
If the difference between the container volume and the calculator display does
not exceed the maximum allowed deviation (check local requirements) then no
further action is necessary. If the difference is outwith the maximum allowed
deviation then follow the instructions below to perform electronic calibration.
ELECTRONIC CALIBRATION FUNCTION
Perform a test filling as described above.
Press 1 to enter EC menu.
Read the volume displayed on the calculator and enter
into the UAK using the numeric keys. Press F4 to
save and continue.
If the difference is within acceptable limits i.e. +/-
0.5% then a new calibration factor will be calculated
and stored and CALIBRATION OK is displayed.
Read the volume displayed on the calibrated container
and enter into the UAK using the numeric keys.
Press F4 to save and continue.
If the difference is outwith the acceptable limit then
CALIBRATION ERR is displayed. Manual
calibration of the meter should then be performed
before attempting electronic calibratation again.
Press ON to start configuration. A choice of menus
will be displayed. Press 1 to enter MAINTENANCE
menu.
Press F1 to return to MAINTENANCE menu.
M P E
0 1 . 0 7
D 3 3 F
1 : M A
2 : T S T
3 : S I M
1 : E C
2 : S E T
3 : S E R V
4 : A D C
D i s p l a y e d
v o l u m e
- - - - . - -
L
C a n
v o l u m e
- - - - . - -
L
C A L I B R A T I O N
O K
C A L I B R A T I O N
E R R
N O
C H A N G E
1 : E C
2 : S E T
3 : S E R V
4 : A D C