![Tokheim Quantium 510 Installation Manual Download Page 34](http://html1.mh-extra.com/html/tokheim/quantium-510/quantium-510_installation-manual_1124937034.webp)
Page 2-16
Document Ref 942583-001 Rev 8
Site Preparation
Quantium 510 Installation Manual
Model SVHS 5-8 L
Prod
1
40
Prod
2
40
Prod
3
40
Diesel
2
130
40
Diesel
1
Diesel 2
Prod 3
Prod 1
Prod 2
Diesel 1
B side (left)
A side (right)
40
Prod
3
40
Prod
2
40
Prod
1
1 x TQP-HS and 4 x TQP-RS or 5 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.
Prod 1
Prod 2
Prod 3
2.2.4
MASTER & SATELLITE MODELS
Model HSM 1-1
Model SVHS 5-8 R
Prod
1
40
Prod
2
40
Prod
3
40
Diesel
2
40
130
Diesel
1
Diesel 2
Prod 3
Prod 1
Prod 2
Diesel 1
B side (left)
A side (right)
40
Prod
3
40
Prod
2
40
Prod
1
1 x TQP-HS and 4 x TQP-RS or 5 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.
Prod 1
Prod 2
Prod 3
Diesel
1
80
Diesel 1
B side (left)
A side (right)
Blind side
In case of NON-preset with TQP-RS, the valves are not needed.
The valve is needed for Preset or in any case of submerge.
Example shown is B sided (left), A sided (right) is also available.
1kW
Satellite Feed with continuous
filling button (optional)