![Tokheim Quantium 510 Installation Manual Download Page 67](http://html1.mh-extra.com/html/tokheim/quantium-510/quantium-510_installation-manual_1124937067.webp)
Document Ref 942583-001 Rev 8
Page 3-17
Quantium 510 Installation Manual
Drawings
3.4.2
TWO FRAMES & TWO COLUMNS MODELS (SUCTION & SUBMERGED) (2-2, 2-4, HS 2-2, HS 2-4, VHS 1-2 SS, VHS
(M)2-4)
NOTE : When measuring from the external edge of a factory
supplied groundframe, add 8mm to dimensions referenced
from edge of driptray base.
Suction Pipe
Mounting Holes Groundframe
Vapour Recovery
*Satellite A
*Satellite B
Electrical
Supply
387.5
60
380
231
387.5
481
581
*-DISPENSER SIDE A-*
100
302.5
217.5
702
933
435
555
540
110
1074
435
*-DISPENSER SIDE B-*
Driptray extent
Prod 1 Prod 2
Side A
Side B
MODEL VHS 1-2 SS, VHS 2-4
Prod 1 Prod 2
MODELS 2-2, 2-4, HS 2-2, HS 2-4
Side A
Side B
58
*For option VR Per Product (Ethanol Split Only) refer to Page 2-29*