Page 2-14
Document Ref 942583-001 Rev 8
Site Preparation
Quantium 510 Installation Manual
Model VHS 4-4
Model VHS 3-6
Diesel
2
40
Diesel 2
B side (left)
1.5kW
A side (right)
Diesel
2
130
40
Diesel
1
130
Diesel
1
Diesel 1
1.5kW
Prod
1
40
Prod 1
Prod 1
40
Prod
1
Two diesel nozzles per side connected to one pump.
3rd nozzle from pump 1.
Diesel
2
40
Diesel 2
B side (left)
1.5kW
A side (right)
Diesel
2
130
40
Diesel
1
130
Diesel
1
Diesel 1
1.5kW
Prod
1
40
Prod 1
Prod 1
40
Prod
1
Prod
2
40
Prod 2
Prod 2
40
Prod
2
130 and 40 for Diesel, 40 or 35/35 for products 1 and 2.
2 x TQP-HS and 2 x TQP-RS or 4 x Submerge.
2 Diesel nozzles per side connected to 1 pump. 3rd and 4th nozzle from pumps 1 and 2.
Model VHS 4-8
B side (left)
A side (right)
Diesel 2
Diesel 4
Diesel
2
130
Diesel
4
130
130
Diesel
3
130
Diesel
1
Diesel 1
Diesel 3
130 for Diesel products 1, 2, 3 and 4.
4 x TQP-HS or 4 x Submerge.
1st and 2nd nozzle from pumps 3 and 1.