-15-
Main Frame Assembly- 3
No.
1
2
3
4
Description
Q'ty
No.
5
6
7
8
Description
Q'ty
1
1
1
2
4
10
1
1
St e p 2
Attach the Battery Tray to the Main Frame and secure it with 6 Tapping Screw.
St e p 1
1.Secure the Servo Tray to the Main Frame.
2.Slide the Phasing Control Track onto the Main Frame and fix it with 2 Tapping Screw.
3.Insert the Metal Frame Spacer between the Main Frame and secure it with the Metal
Canopy Retaining Post.
Ba g F
(5)
(7)
(6)
(6)
(5)
(6)
(6)
(8)
(3)
(1)
(4)
(2)
Servo Tray(Right)
Servo Tray(Left)
Metal Frame Spacer
Metal Canopy Retaining Post
Tapping Screw(w/washer), M2x10
Tapping Screw(w/washer), M2x6
Battery Tray
Phasing Control Track
T22
Summary of Contents for E325 SE mini Titan
Page 1: ...3D PERFORMANCE...
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 57: ...56 JK0264...
Page 58: ...THUNDER TIGER CORPORATION C 2007 www thundertiger com...