-19-
St e p 3
1.Slide the Metal Tail Pitch Control Assembly onto the tail
shaft, insert 2 Flat Washers between the levers and the
joint, then fix it with a M2x16 Socket Screw.
2.Do not over tighten the M2x16 Socket Screw
so that the lever can be rotated freely.
No.
1
2
3
4
5
Description
Q'ty
No.
6
7
8
9
Description
Q'ty
(9)
(6)
(8)
St e p 1
1.Secure the Double Joint Lever to the Tail Unit
Housing.
2.Do not over tighten the M2x16 Socket Screw so
that the lever can be rotated freely.
Tail Unit Assembly- 2
Ba g H
Metal Tail Pitch Control Lever-1
Metal Tail Pitch Control Lever-2
Linkage Ball
Countersunk Screw, M1.6x6
Flat Washer, d2xD3.7x0.5
Countersunk Screw, M2x6
Metal Tail Pitch Control Set
Double Joint Lever
Socket Screw, M2x16
1
1
1
1
3
1
1
1
2
St e p 4
Complete
St e p 2
1.Secure the Linkage Ball to the Metal Tail Pitch
Control Lever-1.
2.Assemble the Metal Tail Pitch Control Levers
and the Metal Tail Pitch Control Set.
(7)
(1)
(6)
(3)
(4)
(2)
(5)
N ot e :
Mind the direction of the double joint lever.
(5)
Summary of Contents for E325 SE mini Titan
Page 1: ...3D PERFORMANCE...
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 57: ...56 JK0264...
Page 58: ...THUNDER TIGER CORPORATION C 2007 www thundertiger com...