(6)
(2)
(4)
(5)
(3)
(3)
(3)
(3)
(2)
(1)
(A)
(E)
(B)
(D)
(C)
Scale 1:1
Step 1
1.Assemble the Linkage Rods and the Ball Links.
2.The length is measured from the center of the Ball Links to the other.
3.You can use the following 1:1 drawing to measure the length of the rods.
Note:
-12-
Step 2
1.Attach the rods to the main rotor system.
2.Please refer to the NOTE that the T mark on the Ball
Link should face out.
Lengths are measured from ball
link center to ball link center.
Bag D
Linkage Rod Installation
X2
(A)
18
7
X1
(B)
7
20
X2
(C)
25
10
X2
(D)
36.5
24.5
X2
(E)
29
41.5
No.
1
2
3
Material No.
Description
Qty
BK0932
BK1063
BK0922
Ball Link 3.8x10mm
Llinkage
Rod 1.3x7mm
Ball Link 3.8x12mm
4
3
14
No.
4
5
6
Material No.
Description
Qty
BK1064
BK1066
BK1065
Llinkage
Rod 1.3x10mm
Llinkage
Rod 1.3x24.5mm
Llinkage
Rod 1.3x29mm
2
2
2
Summary of Contents for E325 SE mini Titan
Page 1: ...3D PERFORMANCE...
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 57: ...56 JK0264...
Page 58: ...THUNDER TIGER CORPORATION C 2007 www thundertiger com...