No.
1
2
3
4
Description
Q'ty
2
2
2
2
No.
5
6
7
8
Description
Q'ty
1
2
2
2
Note2:
-8-
Step 1
1.Secure the Linkage Ball to the Metal Flybar
Control Post.
2.Assemble the Metal Flybar Control Post and
the Metal Flybar Control Arm.
Step 2
1.Slide the Flybar through the Metal Seesaw
Hub, then fit the Metal Flybar Control Arm
onto the Flybar.
2.Make sure the Flybar has equal protruding
of each side and that the Metal Flybar Control
Arms are parallel with each other, then secure
the Metal Flybar Control and the Flybar by
the Set Screws.
Step 3
1.Secure the Paddles to the Flybar.
2.Make sure that the distance from the Flybar
Control Arm to the Paddle are the same in
each side.
3.Make sure that the Paddles and the Flybar
Control Arm are paralleled. Add some CA
glue between the Paddles and the Flybar
after the Paddles are set.
4.
There are two kinds of Paddles come with the
kit, white Paddles are more stable while the
green Paddles are suitable for 3D aerobatics.
Bag B
Main Rotor-3
SUS Flybar Rod
Set Screw, M3x3
Paddle(Standard)
Paddle(3D)
Metal Flybar Control Arm
Metal Flybar Control Post
Linkage Ball, ø3.8
Countersunk Screw, M1.6x6
CA
(7)
(5)
(6)
T22
Note1:
Note:
54mm
83mm
83mm
70mm
70mm
(1)
(2)
(3)
(4)
T22
T22
Summary of Contents for E325 SE mini Titan
Page 1: ...3D PERFORMANCE...
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 57: ...56 JK0264...
Page 58: ...THUNDER TIGER CORPORATION C 2007 www thundertiger com...