No.
1
2
3
4
Description
Q'ty
2
2
2
1
No.
5
6
7
8
Description
Q'ty
2
2
2
2
Linkage Ball, ø3.8
Countersunk Screw, M1.6x6
Metal Rotor Grip
Feathering Shaft
-9-
Step 2
Complete
Step 1
1.Secure the Linkage Balls to the Main Rotor Pitch Housing.
2.Insert the Flap Damper in the Main Rotor Hub.
3.Add some Silicon Oil or Vaseline to insert the Feathering Shaft through the Flap Damper.
4.Assemble the Metal Main Rotor Housing onto the Spindle as the drawing, be sure to use
Loctite on the M2.6x8 Socket Screws(No.8).
5.The radial and thrust bearings are pre-installed by TT factory. The following drawings are
for your reference.
Main Rotor-4
Bag B
Diagram for Thrust Bearing Assembly
Small Internal Diameter
always go toward the
Blade
Large Internal Diameter
always go toward the
Main Rotor Hub
Checking Tips: >
(2)
Flap Damper
Collar, ø4xø7
Flat Washer, d2.6
Socket Screw, M2.6x8
T22
(4)
(3)
(7)
(8)
Note:
(2)
(5)
CA
(1)
(6)
Summary of Contents for E325 SE mini Titan
Page 1: ...3D PERFORMANCE...
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 57: ...56 JK0264...
Page 58: ...THUNDER TIGER CORPORATION C 2007 www thundertiger com...