© 2011 Thorlabs
164
Thorlabs Beam 4.0
- R -
Rayleigh length 87, 142, 145
Reference Position 98
Region of Interest 49, 50
Repetition Frequency 76
Repetitive Pulses 76
Requirements 13
Rising Edge 76
ROI 49, 50, 53, 59
RS232 95
- S -
Safety 5
Saturation Levels 50
Save Measurement Results 70
Save Settings 47
Scroll Bars 26
Sensor Position 8
Serial connection 98
Serial Interface 95
Single Puls’ 76
Software Installation 13
Software Trigger 76
Start the Application 24
Status Bar 26, 132
Symbols 160
- T -
Target Delay 76
Target Position 98
TEM00 142
Test Protocol 70
Times-diffraction-limit factor M2 142
Toolbar 26
Total Power 69
Translation Stage 93
Translation Stage Initialization 98
Translation stage length 87, 145
Trigger 50, 76
Trigger Delay 76
Trigger Input 12
Troubleshooting 117, 135
TTL Trigger Level 12
- U -
Units 59
Unpacking 6
USB Connection 23
USB Driver Installation 23
USB to Serial converter 95, 98
User Filter 50
User Power Correction 65
- V -
Version and other Informations 132
VT-80 93
- W -
Waist diameter 142
Warnings 132
Waste Treatment 159
Wavelength 49, 50, 65, 142
Wavelength Dependent Loss of VIS ND Filters 151
Wavelength Dependent Reflectance of AR Coating on
UV ND Filters 151
Wavelength Dependent Sensitivity 151
Wavelength Range 75
Wavelength Response 151
WEEE 159
Windowless CCD sensor 133
Windows 26
- X -
X Profile Window 37
- Y -
Y Profile Window 37
Summary of Contents for BC106-UV
Page 1: ...2011 Operation Manual Thorlabs Beam Beam Analyzing Software BC106 VIS BC106 UV ...
Page 2: ...Version Date 4 0 11 04 2011 2011Thorlabs 2011Thorlabs ...
Page 76: ... 2011Thorlabs 74 Thorlabs Beam 4 0 Example ...
Page 157: ... 2011Thorlabs 155 Appendix 7 4 4 Drawings 7 4 4 1 BC106 UV ...
Page 158: ... 2011Thorlabs 156 Thorlabs Beam 4 0 7 4 4 2 BC106 VIS ...
Page 159: ... 2011Thorlabs 157 Appendix 7 4 4 3 BC1M2 Mounting Adapter ...
Page 160: ... 2011Thorlabs 158 Thorlabs Beam 4 0 7 4 4 4 Translation Stage VT 80 ...
Page 167: ......