Installing the iN10/iN10MX
This document contains confidential or proprietary information of Thermo Fisher Scientific. Neither this
document nor the information therein is to be reproduced, distributed, used or disclosed, either in whole or
in part, except as specifically authorized by Thermo Fisher Scientific.
8/3/2020
Page 54 of 61
46.17
Insert the crystal into the beampath.
Carefully, while observing the
clearance between the polycarbonate slide and ATR crystal tip, fully
insert the slide back into the dovetail until it hits the hard stop.
Note
If you have an original ATR sample holder, rotate the holder so
the knob does not interfere with the ATR crystal
and then
insert the
slide.
46.18
Identify crystal footprint location.
From the ATR contact screen
select
Manual
. Enter 60 into the pressure dialog box and then click
Set
. The stage will automatically move up (until the pressure reaches
60) and stop.
Note
If this pressure does is not enough to create a well defined
footprint, increase the pressure as necessary.