Thermo Scientific
LTQ Series Getting Connected Guide
1
1
Line Power, Vacuum System, Gases, and
Ethernet Communication
This chapter describes how to connect the LTQ Series MS detector to line power, the
forepump, necessary gases, and the data system computer.
Connecting the MS Detector to Line Power
Y
To connect the LTQ Series MS detector to line power
1. Turn the Main Power circuit breaker to the Off (O) position.
2. Make sure that the Electronics switch is in the Service Mode position.
3. Connect the female plug of the power cord to the POWER IN receptacle of the power
panel.
4. Connect the male plug of the power cord to the 230 V ac power source in your
laboratory.
Contents
•
Connecting the MS Detector to Line Power
•
Connecting the Forepump to the LCQ Fleet or LXQ MS Detector
•
Connecting the Forepumps to the LTQ XL MS Detector
•
Connecting the Gases to the MS Detector
•
Connecting the MS Detector to the Data System Computer
CAUTION
If your local area is subject to power fluctuations or power interruptions, you
must install a power conditioning device or an uninterruptible power supply (UPS) in
your laboratory. For more information, refer to the
LTQ Series
Preinstallation Requirements
Guide
. The UPS must be certified by both North American (UL, CSA) and European
Agencies (TUV, UDE, SEMKO, DEMKO, and so on).