6
Connecting the Inlet Plumbing
Setting Up the Inlet for an LC/MS System with an Autosampler
54
LTQ Series Getting Connected Guide
Thermo Scientific
Figure 37.
Plumbing connections for introducing sample from an autosampler into an ESI/MS system
3. To connect port 3 of the divert/inject valve to the ion source, depending on the probe
type, do one of the following:
• For the ESI probe, use two fingertight fittings and two ferrules to connect a length of
red PEEK tubing between port 3 of the divert/inject valve and the grounding union.
To connect the other end of the grounding union to the ESI probe sample inlet,
follow the instructions in the
Ion Max and Ion Max-S API Source Hardware Manual
.
• For the APCI probe, use two fingertight fittings and two ferrules to connect a length
of red PEEK tubing between port 3 of the divert/inject valve and the APCI probe
sample inlet.
4. To connect the divert /inject valve to a waste container
• Using a fingertight fitting and a ferrule, connect one end of a length of red PEEK
tubing to port 1 of the divert/inject valve.
• Place the other end of the tubing to an appropriate waste container.
Temp
Run
Comm
Power
A
C
D
B
Wash