Loading and Enroute Inspections
84
Figure 30: Loading Considerations
ADZ30
6
8
9
1
2
5
4
7
1.
Correct load height (trailers without chutes)
2.
Tight doors and gaskets
3.
Good air circulation around load
4.
Proper cargo temperature (prior to loading)
5.
Interior/exterior walls and insulation in good
condition
6.
Clear defrost drains
7.
Good outside air circulation
8.
Unit inspection
9.
Tight seals
3
Loading and Enroute Inspections
84
Figure 30: Loading Considerations
ADZ30
6
8
9
1
2
5
4
7
1.
Correct load height (trailers without chutes)
2.
Tight doors and gaskets
3.
Good air circulation around load
4.
Proper cargo temperature (prior to loading)
5.
Interior/exterior walls and insulation in good
condition
6.
Clear defrost drains
7.
Good outside air circulation
8.
Unit inspection
9.
Tight seals
3
Summary of Contents for SB-200TG
Page 1: ...Operator s Manual SB 200TG Operator s Manual SB 200TG TK 53598 2 OP Rev 0 02 07...
Page 7: ...6 Table of Contents 6...
Page 11: ...10 Introduction 10...
Page 21: ...20 EPA Emission Control System Warranty Statement 20...
Page 43: ...42 TG VI Controller Description 42...
Page 45: ...44 Remote Status Light Optional 44...
Page 83: ...82 Alarm Codes 82...
Page 103: ...102 Warranty 102...
Page 117: ...116 Serial Number Locations 116...