Mistblowers Notice of Instructions
Page
30
of
43
•
S position: the system is not at pressure, and all the product goes to return.
DANGER! Follow all the instructions which appear on the product’s label.
6.5.2.
System 1 Electrical Distributor
6.5.2.1.
Pressure Adjustment
1.
With the PTO disconnected, place the switches 1 and 2 of the control in OFF (lower position- turned off leds).
2.
Turn the knobs of the regulators of the self-compensated system (A) in open position (0 position).
3.
Connect the PTO to the working planned revolutions.
4.
Place the switches 1 and 2 in ON (high position – turned on leds).
5.
Turn the pressure knob (B) to the desired pressure, clockwise turn stands for raising pressure, counterclockwise
turn for lowering pressure.
6.
Close the sector 1 (left).
7.
Turn the knob of the regulator of the self-compensated system of the closed sector (left) until the pressure
achieved is the same as the one previously achieved with both sectors open.
8.
Open again the sector and repeat the operation closing and compensating the other side.
6.5.2.2.
Working
The electrical control consists of 2 switches 1 (left sector) and 2 (right sector). By moving each one of the switches
upwards, spraying of the corresponding sector will be activated. The lit light signs indicate the activation of each sector.
Summary of Contents for ASM1-200-24
Page 1: ...www teyme es Lift mounted Mistblower Notice of Instructions T990000005 05 2019 ES Versi n 1 0...
Page 6: ...Mistblowers Notice of Instructions Page 5 of 43...
Page 35: ...Mistblowers Notice of Instructions Page 34 of 43...
Page 36: ...Mistblowers Notice of Instructions Page 35 of 43...
Page 45: ......