SETUP OF THE WIRE ROPE SYSTEMS
max. 10 m
max. 100 m system length
max. 10 m
On-site substructure
Load capacity according to Fig. 7
B/H - TB SKC Evo
Line wire rope
E/K - TB SKC Evo
Line Ladder Bracket
C/I - Carabiner
D/J - TB SKC Evo
Line Spring Tensioner
N - TB SKC Evo Line Display
100 mm
100 mm
max
15°
max
15°
6.2: Fixed mounting according to EN 353-1 on the on-site substructure:
The required load-bearing capacity of the substructure is shown in figure 7.
The wire rope system may only be installed on the substrate using approved components from
Table 1.
Attention!
The TEUFELBERGER SKC EVO Line must not exceed a max. inclination of 15° to the left
or right side as well as to the front or rear!
When installing the wire rope system, a preload of 100 kg must be applied. The preloading is done
with the spring tensioning device at the lower attachment. To do this, tighten the M12 nut until the
indicator plate under the spring has reached the notch on the bracket!
After the installation has been completed, the acceptance report (Enclosure 1) must be filled in!