Section 3 • Scheduled Maintenance Procedures
Part No. 96316
GS-30 • GS-32 • GS-46
3 - 29
June 2006
REV C
Checklist D Procedures
D-1
Check the
Scissor Arm Wear Pads
Genie requires that this procedure be performed
every 1000 hours or annually, whichever comes
first.
Maintaining the scissor arm wear pads in good
condition is essential to safe machine operation.
Continued use of worn out wear pads may result in
component damage and unsafe operating
conditions.
Note: Perform this procedure with the platform in
the stowed position.
GS-1530, GS-1532, GS-1930 and GS-1932:
1 Measure the distance between the number one
outer arm cross tube and the chassis deck at
the ground controls side of the non-steer end of
the machine.
Result: The measurement is
0.90 inch / 22.9 mm or more. Proceed to step 2.
Result: The measurement is less than
0.90 inch / 22.9 mm. Replace both wear pads.
Refer to Repair Procedure 3-1 or 3-2,
How to
Replace the Scissor Arm Repair Pads.
2 Measure the distance between the number one
outer arm cross tube and the chassis deck at
the battery pack side of the non-steer end of
the machine.
Result: The measurement is
0.90 inch / 22.9 mm or more. Proceed to step 3.
Result: The measurement is less than
0.90 inch / 22.9 mm. Replace both wear pads.
Refer to Repair Procedure 3-1 or 3-2,
How to
Replace the Scissor Arm Repair Pads.
a
wear pad
b
outer arm cross tube
c
chassis deck
3 Apply a thin layer of dry film lubricant to the area
of the chassis where the scissor arm wear pads
make contact.
Cross tube to chassis specification
Measurement, minimum
0.90 inch
22.9 mm
a
c
b