TelVue
HyperCaster
®
User
Manual
/
v6.0
/
August
2017
135
Schedule
Switch
event.
Duration
>
0.
Schedule
a
plyout
from
the
home
port
for
the
same
time.
1.
Switch
event
completes.
(Any
scheduled
switch
event
will
occur
unless
switch
is
locked.)
2.
Switch
returns
home.
3.
Server
plays
playout
already
in
progress.
For
example,
if
switch
was
30
seconds,
viewers
miss
30
seconds
of
the
playout
1.
Switch
event
completes.
2.
Playout
completes.
Server
plays
the
“end”
of
it,
however
long
that
is.
3.
Switch
returns
home,
then
the
software
determines
whether
it
needs
to
go
to
continuity
(1
<
second).
Switch
Locked
Use
the
Web
Application’s
Dashboard
to
lock
the
switch
Switch
stays
locked
even
if
other
switch
events
or
playouts
are
scheduled
Switch
stays
locked
if
other
switch
events
or
playouts
are
scheduled.
it
will
not
even
the
switch
for
continuity
Use
the
front
panel
to
move
the
switch
Switch
stays
locked
in
that
path
even
if
other
switch
events
or
playouts
are
scheduled.
Must
unlock
it
by
clicking
Unlock
on
the
Dashboard.
Use
the
front
panel
to
move
the
switch
away
from
the
home
port,
then
schedule
a
playout
The
manual
lock
overrides
the
playout,
so
it
does
not
Use
the
Dashboard
to
unlock
the
switch.
Goes
to
the
switch
output
scheduled
in
the
Telvue
®
scheduled
in
the
TelVue
®
program
software.
You
can
confirm
the
path
bu
looking
at
the
switch’s
front
panel.
User
Management
User
Management
is
available
to
both
users
and
admins.
To
add,
remove,
or
manage
system
users
or
their
permissions
click
on
the
users
option.
A
user
can
also
be
given
API
access
while
creating
or
editing
an
account,
and
they
are
given
an
API
Key
which
can
be
used
whenever
they
need
to
access
API.
The
application
displays
the
User
Management
screen.
©
2017
TelVue
Corporation
16000
Horizon
Way,
Suite
100,
Mt.
Laurel,
NJ
08054
HyperCaster
®
is
a
registered
trademark
of
TelVue
Corporation
800-885-8886
/
http://telvue.com
Summary of Contents for HyperCaster
Page 1: ......