OLT6 and 1134 Description Installation and Turnup Guide
Page 18 of 50
1.4. Installation
Installation Overview
Installation will require the following steps:
·
Inspection of the Chassis for Installation Damage
·
Shelf Installation and Grounding
·
AC Power Supply Installation or DC power install
·
Installation of OFA
·
OLT Card Installation
·
Optical Splitter Installation