1.4.5. Install Optical Fan Assembly

To install a Optical Fan Assembly (OFA1):

1. If not already removed, remove the OLT6 cover by sliding the two cover latches

toward the center and lifting the cover from the chassis.

Figure 9: Tellabs® OLT6/OLT1134

2. Connect an approved Electrostatic Discharge (ESD) strap to a ground on the

equipment rack.

3. Remove the OFA1 fan tray assembly (see Fig. 10) from it's packaging and

inspect for any apparent damage. If any damage is noted, please contact your

Summary of Contents for FlexSym OLT 1134

Page 1: ...Copyright 2021 Tellabs All Rights Reserved OLT6 and 1134 Description Installation and Turnup Guide...

Page 2: ...umes no i responsibility for errors or omissions contained herein or ii liability for any damages resulting from the use of information contained herein Information in this publication is subject to c...

Page 3: ...ation and Turn Up Guide 4 1 1 Description 5 1 2 Safety Precautions 8 1 3 Site Preparation 10 1 4 Installation 18 1 4 1 Inspect OLT Chassis 19 1 4 2 Shelf Installation and Grounding 20 1 4 3 AC Power I...

Page 4: ...s Revision Date Notes A May 2014 Document describes the AC and DC powered version of the shelf B Dec 2015 Document includes instructions for the new TurNup Wizard commands and includes ESU32 in additi...

Page 5: ...ith Cover Off The Tellabs FlexSym OLT6 and the Tellabs FlexSym OLT 1134 are Optical Line Terminals in the Tellabs family of OLAN PON products The Tellabs FlexSym Optical Line Terminal Six OLT6 and Tel...

Page 6: ...lves the Tellabs OLT6 leverages common software and common service cards The OLT6 can be equipped with the Ethernet Switch Unit Thirty Two ESU32 for wide area network connectivity Features The OLT 113...

Page 7: ...nications closets and outdoor remote cabinets It supports mounting via either 19 or 23 bracket options Redundant fan units located in OFA optical fan assembly Components The OLT6 1134 Installation con...

Page 8: ...ble parts in the device Product installation should only be performed by trained service personnel Do not bend the fiber optic cable to a diameter smaller than 7 5cm 3 inches Doing so may damage the f...

Page 9: ...product where people can stand or walk on the power cable Product Disposal The Waste Electrical and Electronic Equipment WEEE symbol shown below will accompany products that must be collected and disp...

Page 10: ...anch circuit breakers and or fuse positions are available in a locally installed DC Rectifier shelf when using 48VDC powering Breakers and fuses must be rated 15 Amps and be suitable for branch protec...

Page 11: ...fy the rack that the chassis is to be installed in is properly installed and grounded 2 Verify that overhead cable trays have been installed for the new equipment 3 Verify that rack mounted cable mana...

Page 12: ...es Serial Cable Initial turnup of the 1134 or OLT6 shelf will require a serial cable to set the IP address and initial uplink settings You will need a terminal program to access the serial interface o...

Page 13: ...mbly 1 81 4115094FS OFA1 Fan Assembly 1 Laser Part Numbers Laser modules for the PONs and Uplinks must be purchased separately The OLT mini comes equipped with no laser modules Both PON lasers in the...

Page 14: ...AC Power Specifications Value Comments AC Input Voltage 100 240VAC AC Input Line Frequency 50 60Hz nominal AC Current Rating 5A 100VAC 2 5A 240VAC Max AC Input Power 600 W The 1134 OLT6 has the follo...

Page 15: ...an module are hot inserted i e can be replaced with the power on This is part of the redundancy design and ensures continued service while replacing cards or the fan module Physical Specifications Phy...

Page 16: ...ifications Reduced Air Flow Installation of the Tellabs 1134 OLT6 in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised Ensure that air i...

Page 17: ...thing Reliable earthing when rack mounting the Tellabs 1134 OLT6 should be maintained Particular attention should be given to supply connections other than direct connections to the branch circuit e g...

Page 18: ...llation Installation Overview Installation will require the following steps Inspection of the Chassis for Installation Damage Shelf Installation and Grounding AC Power Supply Installation or DC power...

Page 19: ...cate the package containing the OLT chassis 2 Open the package and examine the OLT for any apparent damage 3 If damage is noted do not proceed and contact your Tellabs sales representative for a repla...

Page 20: ...ws prior to inserting the lower mounting screws as some play is typically needed to properly align all four holes 5 Insert the remaining two screws into the bottom mounting holes and tighten as requir...

Page 21: ...scription Installation and Turnup Guide Page 21 of 50 good path to earth ground The ground wire should never be connected directly to any power supply ground or return lead as this can introduce noise...

Page 22: ...ier s to be installed in the rear of the unit Use the following procedure to install the redundant AC DC rectifiers Note The OLT6 can accommodate two rectifiers configured to support redundant powerin...

Page 23: ...of the OLT6 shelf by removing the 2 securing knurled nuts and pulling the cover away from the chassis 5 Prior to installing the first rectifier use a 2 Phillips screwdriver and loosen the two captive...

Page 24: ...e Page 24 of 50 6 Install the rectifier onto the top rectifier slot guide and fully insert the rectifier into the OLT6 chassis 7 Close the latches and secure the 2 captive screws 8 Install an AC power...

Page 25: ...nor and Major alarm LEDs illuminate momentarily as the rectifier logic stabilizes 13 The rectifier should stabilize in approximately 8 seconds 14 If a redundant power supply is being installed repeat...

Page 26: ...mount of play is needed to align all the holes 4 Insert the two remaining screws into the bottom mounting holes and tighten as required Tighten the two upper mounting screws to ensure the shelf is sec...

Page 27: ...nup Guide Page 27 of 50 8 Replace the Tellabs cover if previously removed 9 Route the power cable assembly up the rack side rail dressing the cable as needed 10 Turn on the 48V Supply and the chassis...

Page 28: ...ve the OLT6 cover by sliding the two cover latches toward the center and lifting the cover from the chassis Figure 9 Tellabs OLT6 OLT1134 2 Connect an approved Electrostatic Discharge ESD strap to a g...

Page 29: ...OLT6 and 1134 Description Installation and Turnup Guide Page 29 of 50 Tellabs Sales Representative for a replacement unit...

Page 30: ...OLT6 and 1134 Description Installation and Turnup Guide Page 30 of 50...

Page 31: ...1 4 Insert the OFA1 fan tray into the chassis Slide the unit in until it engages with the connectors on the chassis backplane 5 The STAT LED on the OFA1 fan tray will illuminate RED and then transitio...

Page 32: ...that the fiber connectors are properly cleaned per local standards Dirty connectors may result in inaccurate measurements Warning To prevent damage to fibers maintain a minimum 3 inch bend radius when...

Page 33: ...nd lower ejectors to seat the card 6 Upon insertion the STAT LED illuminates RED while performing internal power up diagnostics Upon successful completion of the power up diagnostics the STAT LED blin...

Page 34: ...ns or livestock dispose of loose fiber ends properly Warning Ensure that the fiber connectors are properly cleaned per local standards Dirty connectors may result in inaccurate measurements Warning To...

Page 35: ...per and lower ejectors 4 Upon insertion the STAT LED illuminates RED while the card performs internal power up diagnostics Upon successful completion of the power up diagnostics the STAT LED blinks GR...

Page 36: ...ures Even if not installing PPGs it is recommended to utilize a 2 N splitter as the cost differential is small and future proofs the network should protection be needed at a later date Typical split r...

Page 37: ...te with notch on the connector of the splitter b Ensure that an audible click is heard when installing the cable to ensure the cable is properly seated c Clean fibers prior to every installation of a...

Page 38: ...ation or turnup of the OLT After turnup the OLT can be added to and managed by the Panorama PON graphical user interface To turnup the OLT perform the following steps Wait for the system ready message...

Page 39: ...commands available in the current context ESU32 Commands adduser Allows Admin user to add local users to the database alarms alarm related operations cistbstat Display CIST Bridge Parameters Status ci...

Page 40: ...Display Spanning Tree configuration swinv Displays software inventory switchloads Switch to Standby load template all template related commands trunkconf Displays info on uplink trunk aggregated Ethe...

Page 41: ...the wizard command is displayed in the help listing as WIZard This case convention indicates that the command can be invoked using either wizard or the abbreviated form wiz The CLI also provides for t...

Page 42: ...se a real security risk Separating them ensures that users cannot access the management interface This setting must agree with the upstream switch setting for the management VLAN VLAN ID for Element m...

Page 43: ...ment Configuration Bridge Configuration Bridging Type 802 1q Network Interface s Interface ID NET1 Admin State enabled Port ID s Port 1 MDS1 ESUA 1 LACP Admin State disabled Mode active Timer long VLA...

Page 44: ...s Element Management configuration may trigger a restart y n n _ If you made a mistake during Turnup enter N at this prompt and the wizard will terminate without applying the turnup data entered You c...

Page 45: ...at provides end to end management of the Optical LAN Panorama simplifies LAN management by providing Centralized intelligence Management of the OLT optical network terminals ONT and subtended devices...

Page 46: ...tton Selecting the ERASE option tells the system to cleanup any residual provisioning that might result from component reuse The data collected during the OLT turnup process will not be erased If Pano...

Page 47: ...ntifier text box and enter the appropriate time zone data Click the Next button The Template section of this dialog provides a mechanism for automatic discovery and provisioning of PONs ONTs and Ether...

Page 48: ...and 1134 Description Installation and Turnup Guide Page 48 of 50 Click the Confirm and Apply Button Panorama will add the OLT This will take a few minutes When the add is completed click the Finish bu...

Page 49: ...324 option 1 International 1 630 798 9900 option 1 France 01 85 64 04 05 option 1 Tellabs Warranty Repair Center The Tellabs Repair Center is staffed Monday Friday 6 00 AM 4 00 PM CT excluding Tellabs...

Page 50: ...OLT6 and 1134 Description Installation and Turnup Guide Page 50 of 50 International 1 630 798 9900 option 6 France 01 85 64 04 05 option 6...

Reviews: