1.3. Site Preparation
Power Considerations
Prior to beginning the installation, ensure that the following power related items are
considered:
1. Verify that proper ground connections are available for correct terminal
operation.
2. Verify that the power outlet connector type matches the power cable end ordered
with the OLT.
3. Verify that any UPS systems being used are installed and operating correctly.
4. If power redundancy is being used, ensure both feed circuits are operational.
5.
48VDC Powering:
Verify that suitably rated branch circuit breakers and/or fuse
positions are available in a locally installed DC Rectifier shelf when using 48VDC
powering. Breakers and fuses must be rated 15 Amps and be suitable for branch
protection.
Power Availability
When the equipment is being installed, ensure that there is an available 100/240 VAC
outlet within six feet of the unit. If the OLT is to operate in redundant supply mode, two
100/240 VAC outlets, on different feed circuits, should be within six feet of the unit.
Facility Grounding
Ensure that the facility grounding system is installed in accordance with EIA/TIA-607
Grounding and Bonding Requirements for Telecommunications in Commercial Building
United States Department of Agriculture Rural Utilities Service (RUS) Bulletin 1751F-
810, and/or local practices, as applicable.