![Telenetics Corporation FT100 S Installation And Operation Manual Download Page 87](http://html1.mh-extra.com/html/telenetics-corporation/ft100-s/ft100-s_installation-and-operation-manual_1082085087.webp)
Control Port Operation
FT
100S
6-9
CONNECTING TO A TERMINAL
To operate the unit with a CRT terminal:
1. Connect the FT 100S control port to a terminal with a stan-
dard PC 25 pin to 9 pin conversion cable. Refer to Table 2-
2 for pin connections.
2. Using the front panel, select terminal operation and the
desired control port baud rate, and enable local character
echo if desired.
Word length is fixed at 8 data bits with 1 stop bit and no parity.
3. Enter a / on the keyboard to display the sign-on screen:
The following illustration shows connection application to a terminal.
Figure 6-2
Terminal Connection
VT 100
115 VAC
60 HZ
14W
CONTROL
PORT 1
NWK
FUS
E
FU
SE
F
U
S
E
3/16
AMP S.B.
250 VAC
FT 100S (rear)
Control port
Summary of Contents for FT100 S
Page 10: ...ESF Framing C 4 Framing Format Conversion C 6 Performance Monitoring C 6 Service and Support...
Page 22: ...Installation 2 8 FT 100S...
Page 28: ...Hardware Configuration 3 6 FT100S...
Page 106: ...Control Port Operation 6 28 FT 100S...
Page 108: ...Maintenance 7 2 FT 100S...
Page 116: ...Specifications A 4 FT 100S...
Page 120: ...Control Port Command Quick Reference B 4 FT 100S...
Page 128: ...T1 Overview C 8 FT 100S...