![Telenetics Corporation FT100 S Installation And Operation Manual Download Page 21](http://html1.mh-extra.com/html/telenetics-corporation/ft100-s/ft100-s_installation-and-operation-manual_1082085021.webp)
Installation
FT
100S
2-7
POWER
Power is supplied through a 6-foot line cord with a grounded 3-wire
plug (attached to the unit). If chassis ground is available through the
third prong of the plug, a separate ground wire is not required.
20
H
Data terminal ready
21
BB/b
Remote loopback
22
--
Not used
23
W
Ext transmit clock B
24
U
Ext transmit clock A
25
K
Test mode
Table 2-4. V.35 Functions (Part Number 5003769-01)
Summary of Contents for FT100 S
Page 10: ...ESF Framing C 4 Framing Format Conversion C 6 Performance Monitoring C 6 Service and Support...
Page 22: ...Installation 2 8 FT 100S...
Page 28: ...Hardware Configuration 3 6 FT100S...
Page 106: ...Control Port Operation 6 28 FT 100S...
Page 108: ...Maintenance 7 2 FT 100S...
Page 116: ...Specifications A 4 FT 100S...
Page 120: ...Control Port Command Quick Reference B 4 FT 100S...
Page 128: ...T1 Overview C 8 FT 100S...