318
PICam™ 5.x Programmer’s Manual
Issue 11
4. Launch
EMGainCalibration.exe.
CAUTION!
!
Do not operate the camera while EM gain calibration is in
process.
5. When the EM Gain Calibration dialog is displayed, the default temperature for the
camera is shown in the Target field. See
.
Figure B-1: Typical EM Gain Calibration Dialog
If the camera typically operates at a different temperature, manually adjust it as
necessary.
6. Once the Current temperature reaches the Target temperature specified:
•
The internal shutter closes;
NOTE:
When using a manual shutter, it must be closed prior to
initiating the calibration procedure.
•
The internal light illuminates the sensor;
•
A series of data frames is acquired;
•
The calibration map is then calculated.
NOTE:
Wait until the calibration has completed before launching
the data acquisition program. It may take up to 10 minutes
for the calibration to be completed.
441
1-01
6
1_
0
0
0
4
Summary of Contents for Princeton Instruments PICam 5.x
Page 1: ...www princetoninstruments com PICam 5 x Programmer s Manual 4411 0161 Issue 11 June 28 2021...
Page 4: ...4 PICam 5 x Programmer s Manual Issue 11 This page is intentionally blank...
Page 14: ...14 PICam 5 x Programmer s Manual Issue 11 This page is intentionally blank...
Page 180: ...180 PICam 5 x Programmer s Manual Issue 11 This page is intentionally blank...
Page 192: ...192 PICam 5 x Programmer s Manual Issue 11 This page is intentionally blank...
Page 290: ...290 PICam 5 x Programmer s Manual Issue 11 This page is intentionally blank...
Page 302: ...302 PICam 5 x Programmer s Manual Issue 11 This page is intentionally blank...
Page 326: ...324 PICam 5 x Programmer s Manual Issue 11 This page is intentionally blank...
Page 351: ...This page is intentionally blank...
Page 354: ......