
Trace Nitrogen in Argon Analyzer
Installation
Teledyne Analytical Instruments
17
Installation
Installation of the Model 2120XL Trace Nitrogen in Argon
Analyzer can involve potentially hazardous procedures.
CAUTION:
INSTALLATION SHOULD BE PERFORMED ONLY BY
TRAINED AND QUALIFIED PERSONNEL WHO HAVE
READ AND UNDERSTOOD THE INSTRUCTIONS IN
THIS MANUAL.
Installation of the Model 2120XL Trace Nitrogen in Argon
Analyzer includes:
Unpacking
Choosing an Appropriate Location
Mounting
Electrical connections
Gas connections
Purging
Calibration
3.1 Unpacking the Instrument
The analyzer is shipped with all the materials you need to install
and prepare the system for operation. Carefully remove the analyzer from
the shipping container and visually inspect it for damage. Maintain it in an
upright position and avoid jarring. Ensure the power cord and calibration
data sheets are included and that all components ordered have been
supplied. Remove any plugs that may be installed on the gas tube fittings
on the rear panel.
If any items are missing or the analyzer appears damaged,
immediately report any damage to the shipping agent and notify
Teledyne. Remove and discard caps from fittings; inspect the analyzer
for loose fittings or connections.
Summary of Contents for 2120XL
Page 12: ...Model 2120XL Teledyne Analytical Instruments xii ...
Page 28: ...Operational Theory Model 2120XL Teledyne Analytical Instruments 16 ...
Page 46: ...Installation Model 2120XL Teledyne Analytical Instruments 34 ...
Page 76: ...Operation Model 2120XL Teledyne Analytical Instruments 64 ...
Page 82: ...Maintenance Model 2120XL Teledyne Analytical Instruments 70 ...