Appendix D: Performance Verification
D–4
THS 710 & THS 720 User Manual
Performance Verification Procedures
Before beginning these procedures, two conditions must first be met:
H
The TekScope instrument must have been operating continuously
for ten minutes within the operating temperature range specified.
H
You must perform the Compensate Signal Path operation
described on page 3–57. If the operating temperature changes by
more than 5
°
C, you must perform the Compensate Signal Path
operation again.
The time required to complete the entire procedure is approximately
one hour.
WARNING.
Some procedures use hazardous voltages. To prevent
electrical shock, always set voltage source outputs to 0 V before
making or changing any interconnections.
Summary of Contents for TekScope THS 710
Page 12: ...Getting Started...
Page 13: ......
Page 24: ...Operating Basics...
Page 25: ......
Page 65: ...Application Examples 2 40 THS 710 THS 720 User Manual...
Page 66: ...Reference...
Page 67: ......
Page 69: ...Introduction to Reference 3 2 THS 710 THS 720 User Manual...
Page 131: ...VERTICAL Controls 3 64 THS 710 THS 720 User Manual...
Page 132: ...Appendices...
Page 133: ......
Page 157: ...Appendix C Accessories C 6 THS 710 THS 720 User Manual...
Page 179: ...Appendix D Performance Verification D 22 THS 710 THS 720 User Manual...
Page 181: ...Appendix E General Care and Cleaning E 2 THS 710 THS 720 User Manual...
Page 182: ...Glossary and Index...
Page 183: ......