Section 7: High voltage capacitance measurements
Model 8010 High Power Device Test Fixture User's Manual
7-10
8010-900-01 Rev. C / March 2017
The next figure shows how to perform an open connection test without a device inserted:
Figure 74: Model 8010 and CVU-3K-KIT 3-terminal DUT open for Cgd and Crss connections
The next figure shows how to perform a short connection test without a device inserted and how to
install a short between the fixture terminals (that normally would be connected to the gate and drain
of the FET):
Figure 75: Model 8010 and CVU-3K-KIT 3-terminal DUT short for Cgd and Crss connections